Kitchen Cabinet Installation in Palm Beach Gardens, FL for Palm Beach County homes.
Genesis Kitchen & Bath Designs handles kitchen cabinet installation for homes in Palm Beach Gardens and across Palm Beach County. With a population of 60,959 and median home values of $565,000-$682,000, Palm Beach Gardens covers a wide range of properties and budgets. Local conditions we plan around here include HOA Architectural Review Boards in EVERY gated community. An accurate estimate starts with measuring the actual room.

Local facts
Kitchen Cabinet Installation in Palm Beach Gardens, by the numbers.
Population and home value: U.S. Census Bureau QuickFacts. Permit office: official municipal website.
Why it is different here
What shapes a remodel in Palm Beach Gardens.
Resort-luxury market — 5+ premier gated country clubs with designer-grade renovation standards; average kitchen remodel $100K+, bathroom $50K+, whole-home reno $500K-$2M; HOA architectural compliance is the differentiator that wins contracts.
- HOA Architectural Review Boards in EVERY gated community
- 1980s-1990s homes need full systems update
Communities in Palm Beach Gardens include PGA National, Mirasol, Frenchman's Creek.
Services in Palm Beach Gardens
More Genesis services in Palm Beach Gardens.
FAQ
Kitchen Cabinet Installation in Palm Beach Gardens, answered.
Yes, when the project moves plumbing, changes electrical circuits or alters walls. In Palm Beach Gardens, building permits are issued by City of Palm Beach Gardens Building Division, 10500 N Military Trl — (561) 799-4210 — pbgfl.gov/194. Replacing a countertop or vanity in the same place usually needs less paperwork than a layout change, and the permit office confirms the exact requirement for each address.
The room is measured and the layout is marked on the walls, the floor is checked for level, and the wall studs are located. Wall cabinets are hung on the studs, base cabinets are set, leveled with shims and screwed together, and then fillers, toe kicks and trim close the gaps. Countertops are templated only after the base cabinets are level and fixed.
The number of cabinets, whether they arrive assembled, the amount of trim such as crown molding and panels, and how much plumbing or electrical has to move set most of the labor. A written estimate after the kitchen is measured is the only reliable number.
Replacing cabinets in the same layout usually needs less paperwork than moving plumbing or electrical. In Palm Beach Gardens, building permits are issued by City of Palm Beach Gardens Building Division, 10500 N Military Trl — (561) 799-4210 — pbgfl.gov/194, which confirms the requirement for each address.
The old cabinets and countertops are removed, the walls are patched, and any plumbing or electrical that moves is roughed in first. Flooring that runs under the cabinets is usually finished before the base cabinets are set.
The cabinets are ordered once the layout is measured and approved, because every box size, filler and panel comes from that measurement. Installation starts after the full order arrives and every box has been checked for damage and the correct size.
Yes. The sink, faucet and dishwasher are disconnected when the old cabinets come out. The new sink base is cut for the water and drain lines, and everything is reconnected after the countertop is set.
Wood cabinets react to humidity, so they are best stored inside the air-conditioned house, not in a garage, until they are installed. In humid Florida weather this keeps doors and face frames from swelling after they are hung.
Also serving
GENESIS